|
Quick mold change (QMC) is a very broad topic. Are we talking
about just clamping the mold to the platens or are we talking
about clamping, connecting water lines, connecting electrical and
air, etc. What is the goal for time savings on a typical
production mold change? There are so many facets of a mold
change to be considered that one must consider how deep you want
to go. Make sure to consider all of the details of the mold change
before a decision is made on a system to implement. If a system is
implemented that just automates clamping the mold to the platen
and then later it is determined that water connections need to be
automated, a redesign of the clamping system may be necessary to
incorporate the water system.
Two companies that specialize in QMC are
www.astar.com
and www.clrh.com,
each of which has developed systems, products and procedures for
quick mold change.
As you look through their products you can decide which company
will suit your needs.
QMC has to start in the engineering department. Once a company
decides on a QMC system, all of the tools that run in that machine
will need to be built to work with the QMC system. Keep this in
mind. |