IMM 12/95

What is the average time for installing an average mold with standard cooling and no
added electronics? Could someone provide some guidelines for 24-ton, 75-ton, and
250-ton machines?

24-ton
1 hour max.
10 minutes
15 minutes with mold base
30 minutes
25 minutes without mold base

75-ton
1 hour
15-20 minutes
30 minutes
1 hour
40 minutes with positive knockout

250-ton
1½ hours1
30-35 minutes2
45 minutes3
1½ hours4
55-60 minutes with positive knockout

1


These times assume an organized setup operation, and that no appreciable time is spent looking for the right clamps or the right bolts. For the smaller presses, for a mold that the setup person has done before, the time required may be as short as 20 minutes.-W. Foster, Tessy Plastics Corp., Elbridge, NY, (315) 689-3924.
2 -J. Evans, T-Pro, Eugene, OR, (503) 345-2819.
3 -D. Fox, Advanced Molding, Ontario, OR, (503) 881-1499.
4 -B. Rea, Precision Southeast, Myrtle Beach, SC, (803) 347-4218.

With our 28-ton machine, what used to take 30 to 45 minutes now takes 5 minutes with our Staubli QMC system, from part to part.